Earned Value Management Beyond Compliance: Reconciling SPI/CPI Metrics with Predictive Forecasting in Complex Projects

Dominic Feboh, Ogochukwu T. Izuchukwu, Abeebat Ajirotutu

Abstract

This review examines the continuing relevance of Earned Value Management as a project- control framework for complex delivery environments where cost, schedule, risk and governance pressures intersect. Its purpose is to assess how traditional performance indicators, particularly the Schedule Performance Index and Cost Performance Index, can be interpreted beyond compliance reporting and integrated with predictive forecasting to strengthen managerial foresight. The study adopts a conceptual review approach, drawing on scholarly literature on earned value methods, project governance, forecasting, data quality, risk-informed control and sectoral project performance. The review finds that SPI and CPI remain valuable diagnostic measures because they provide concise evidence of schedule efficiency and cost efficiency against an approved baseline. However, the analysis also shows that these indicators become limited when treated as isolated numerical outputs. They may reveal deviation but cannot, by themselves, explain baseline weakness, critical-path exposure, uncertainty, data unreliability or future recovery probability. The study further establishes that predictive forecasting, including earned schedule logic, statistical modelling, risk-adjusted analysis, estimate-at-completion methods and integrated data visualisation, can reposition earned value information as an anticipatory governance instrument. The review concludes that effective project control requires the reconciliation of conventional EVM metrics with predictive intelligence, reliable measurement systems and disciplined governance response. It recommends that organisations strengthen baseline assurance, improve data integrity, integrate cost-schedule-risk platforms, develop project-control capability and establish clear escalation thresholds for early corrective action. Overall, the paper affirms that earned value information should not merely document past performance; it should support timely prediction, accountability and strategic intervention in complex projects. This perspective advances more resilient, transparent and evidence-led project delivery practice globally.

Keywords

Earned Value Management; Schedule Performance Index; Cost Performance Index; predictive forecasting; project governance; complex projects.

References

Abosede, A.O., Oke, A.E., and Aigbavboa, C.O. (2019). Performance analysis of small and medium-sized construction firms in Oyo State, Nigeria, Acta Structilia, 26(1), pp. 66–96. doi: https://doi.org/10.18820/24150487/as26i1.3. Acebes, F., Pajares, J., Galán, J.M. and López-Paredes, A. (2014). A new approach for project control under uncertainty: Going back to the basics, International Journal of Project Management, 32(3), pp. 423–434. doi: https://doi.org/10.1016/j.ijproman.2013.08.003. Adesuyi, M.O., Walawalkar, G., and Kalu, A. (2022). Predictive budgeting models using operational and market signals, International Journal of Scientific Research in Computer Science, Engineering and Information Technology, 8(5), pp. 818–837. doi: https://doi.org/10.32628/IJSRCSEIT. Akeju, B., Edivri, J., Ogbole, J.I., Okoruwa, P.O., Fadayomi, O., and Abolaji, T.O. (2018). Conceptual model for insider threat classification and risk modeling in complex digital systems, Iconic Research and Engineering Journals, 1(9), pp. 476–492. doi: https://doi.org/10.64388/IREV1I9-1713778. Akin-Oluyomi, O.T. and Akhigbe, R. (2022). A supply chain governance model for enhancing compliance and operational quality across retail networks, International Journal of Advanced Multidisciplinary Research and Studies. doi: https://doi.org/10.54660/.IJMRGE.2022.3.6.860-878. Alborzi, A. (2021). Framework for modeling and assessing anthropogenic influence on built and natural environments in a changing climate (Doctoral dissertation, University of California, Irvine). Amini Khafri, A. (2018). A Framework for Forecasting Project Estimate at Completion Using Historical and Current Performance Data. Anbari, F.T. (2003). Earned value project management method and extensions, Project Management Journal, 34(4), pp. 12–23. doi: https://doi.org/10.1177/875697280303400403. Anton, P.S., Shelton, W., Ryseff, J., Cohen, S., Johnson, G., Joplin, S.B., Kravitz, D., McKernan, M., and Camargo, A.V. (2022). Early Predictive Indicators of Contractor Performance: A Data-Analytic Approach. Aramali, V., Gibson Jr, G.E., El Asmar, M., and Cho, N. (2021). Earned value management system state of practice: Identifying critical subprocesses, challenges, and environmental factors of a high-performing EVMS. Journal of Management in Engineering, 37(4), p.04021031. Batselier, J. and Vanhoucke, M. (2015). Empirical evaluation of earned value management forecasting accuracy for time and cost, Journal of Construction Engineering and Management, 141(11), 05015010. doi: https://doi.org/10.1061/CO.1943- 7862.0001008. Biesenthal, C. and Wilden, R. (2014). Multi-level project governance: Trends and opportunities’, International Journal of Project Management, 32(8), pp. 1291–1308. doi: https://doi.org/10.1016/j.ijproman.2014.06.005. Chizaryfard, A., Nuur, C., and Trucco, P. (2022). Managing structural tensions in the transition to the circular economy: the case of electric vehicle batteries. Circular Economy and Sustainability, 2(3), pp.1157-1185. Dada, T., Isiekwu, C.P., and Oluwo, K. (2021). Advances in multinational cash flow consolidation and FX risk control using tiered treasury architecture, Iconic Research and Engineering Journals, 4(11), pp. 601–620. doi: https://doi.org/10.64388/IREV4I11- 1714351. Dada, T., Isiekwu, C.P., and Oluwo, K. (2021). Designing CRM-based sales forecasting models for multichannel lending institutions, Iconic Research and Engineering Journals, 5(3), pp. 451–466. doi: https://doi.org/10.64388/IREV5I3-1714352. Day, L.E. (2011). The integration of software quality into software project management (Doctoral dissertation, Walden University). Ead, R. (2020). Using Monte Carlo simulation to evaluate the performance of forecasting models in project control. Elshaer, R. (2013). mpact of sensitivity information on the prediction of project’s duration using the earned schedule method, International Journal of Project Management, 31(4), pp. 579–588. doi: https://doi.org/10.1016/j.ijproman.2012.10.006. Emam, H., (2021). Optimising project controls for construction using BIM and Big Data Analytics (Doctoral dissertation, University of Bolton). Fadayomi, O., Abolaji, T.O., Edivri, J., Ogbole, J.I., Okoruwa, P.O., and Akeju, B. (2019). Risk- based cybersecurity assurance and data availability limitations, advances, and future research opportunities, Iconic Research and Engineering Journals, 2(12), pp. 602–617. doi: https://doi.org/10.64388/IREV2I12-1713779. Falemi, A., Akhigbe, R., and Akin-Oluyomi, O.T. (2020). A conceptual supply chain talent development model for capability building across distributed operations, International Journal of Advanced Multidisciplinary Research and Studies. doi: https://doi.org/10.54660/.IJMRGE.2020.1.5.439-456. Fleming, Q.W. and Koppelman, J.M., (2016). Earned value project management. Project Management Institute. Isiekwu, C.P., Oluwo, K., and Dada, T. (2021). A conceptual model for CFO-led strategic finance in joint venture and cross-border partnerships, Iconic Research and Engineering Journals, 4(7), pp. 383–400. doi: https://doi.org/10.64388/IREV4I7-1714350. Jaber, F.K., Jasim, N.A., and Al-Zwainy, F.M. (2020). Forecasting techniques in the construction industry: earned value indicators and performance models. Przegląd Naukowy. Inżynieria i Kształtowanie Środowiska, 29(2 [88]). Joseph, O.B. (2022). Lecturers’ perspectives on challenges facing final-year engineering students at a TVET college in Nongoma, KwaZulu-Natal. Master’s dissertation. University of South Africa. Available at: https://uir.unisa.ac.za/handle/10500/30003. Joslin, R. and Müller, R. (2016). The relationship between project governance and project success, International Journal of Project Management, 34(4), pp. 613–626. doi: https://doi.org/10.1016/j.ijproman.2016.01.008. Khamooshi, H. and Golafshani, H. (2014). EDM: Earned Duration Management, a new approach to schedule performance management and measurement, International Journal of Project Management, 32(6), pp. 1019–1041. doi: https://doi.org/10.1016/j.ijproman.2013.11.002. Khesal, T., Saghaei, A., Khalilzadeh, M., Galankashi, M.R., and Soltani, R. (2019). Integrated cost, quality, risk, and schedule control through earned value management , Journal of Engineering, Design and Technology, 17(1), pp. 183–203. doi: https://doi.org/10.1108/JEDT-07-2018-0119. Kim, M.H., Lee, E.B., and Choi, H.S. (2019). A forecast and mitigation model of construction performance by assessing detailed engineering maturity at key milestones for offshore EPC mega-projects. Sustainability, 11(5), p.1256. Ladapo, O.O., Dosunmu, A.A., Jooda, D., and Abolaji, T.O. (2018). Lessons learned from offline assessment of security-critical systems: The case of Microsoft Active Directory, Iconic Research and Engineering Journals, 2(6), pp. 277–299. doi: https://doi.org/10.64388/IREV2I6-1717205. Ladapo, O.O., Jooda, D., Dosunmu, A.A., and Abolaji, T.O. (2019). Implementation of Active Directory for efficient management of enterprise networks, Iconic Research and Engineering Journals, 3(4), pp. 608–627. doi: https://doi.org/10.64388/IREV3I4- 1717206. Laird, A. (2011). Delivering Value for Money: Trust and Verify? In International Conference on Radioactive Waste Management and Environmental Remediation (Vol. 54983, pp. 379- 387). Lipke, W., Zwikael, O., Henderson, K., and Anbari, F. (2009). Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes, International Journal of Project Management, 27(4), pp. 400–407. doi: https://doi.org/10.1016/j.ijproman.2008.02.009. Mayo, W., Ogbole, J.I., Okoruwa, P.O., and Babatope, O.M. (2021). Designing an AI-predictive maintenance model for e-commerce systems using machine learning and cloud analytics, International Journal of Scientific Research in Computer Science, Engineering and Information Technology, 7(5), pp. 416–440. doi: https://doi.org/10.32628/IJSRCSEIT. Miller, R. and Hobbs, B. (2005). Governance regimes for large complex projects, Project Management Journal, 36(3), pp. 42–50. doi: https://doi.org/10.1177/875697280503600305. Nkiwane, N.H., Meyer, W.G., and Steyn, H. (2016). The use of Earned Value Management for initiating directive project control decisions: A case study, South African Journal of Industrial Engineering, 27(1), pp. 192–203. doi: https://doi.org/10.7166/27-1-1260. Ogbole, J.I., Okoruwa, P.O., Babatope, O.M., and Oyewole, T. (2021). Developing an integrated data visualization model for continuous business performance monitoring and optimization, International Journal of Scientific Research in Computer Science, Engineering and Information Technology, 7(5), pp. 441–467. doi: https://doi.org/10.32628/IJSRCSEIT. Ogbole, J.I., Okoruwa, P.O., Fadayomi, O., Abolaji, T.O., Edivri, J. and Akeju, B. (2021) ‘Conceptual model for identity-centric Zero Trust Architecture in enterprise security governance’, International Journal of Scientific Research in Computer Science, Engineering and Information Technology, 7(5), pp. 393–415. doi: https://doi.org/10.32628/IJSRCSEIT. Okojie, J.S., Filani, O.M., Ihwughwavwe, S.I., and Sakyi, J.K. (2020). Sustainable procurement practices: ESG-integrated supply chain models for corporate responsibility and environmental performance’, IRE Journals, 4(2). Okoruwa, P.O., Fadayomi, O., Akeju, B., Edivri, J., Ogbole, J.I., and Abolaji, T.O. (2020). Conceptual model for privacy-centric security engineering in digital and cloud computing systems, International Journal of Scientific Research in Computer Science, Engineering and Information Technology, 6(5), pp. 371–389. doi: https://doi.org/10.32628/IJSRCSEIT. Oluwo, K.A.Y.O.D.E., Dada, T.O.S.I.N., and Isiekwu, C.P. (2022). A review of integrated product innovation cycles in human capital and financial services. Iconic Res Eng J, 5(12), pp.560-86. doi: https://doi.org/10.64388/IREV5I12-1714353. Orgut, R.E., Zhu, J., Batouli, M., Mostafavi, A., and Jaselskis, E.J. (2018). Metrics that matter: Core predictive and diagnostic metrics for improved project controls and analytics. Journal of Construction Engineering and Management, 144(11), p.04018100. Pajares, J. and López-Paredes, A. (2011). An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index, International Journal of Project Management, 29(5), pp. 615–621. doi: https://doi.org/10.1016/j.ijproman.2010.04.005. Pitkänen, J. (2017). Project monitoring in industrial mechanical installations. Proaño-Narváez, M., Flores-Vázquez, C., Vásquez Quiroz, P. yÁvila-Calle, M. (2022). Earned Value Method for construction projects: Current application and future projections, Buildings, 12(3), 301. doi: https://doi.org/10.3390/buildings12030301. Sakyi, J.K., Filani, O.M., Nnabueze, S.B., Okojie, J.S., and Ogedengbe, A.O. (2022). Developing KPI frameworks to enhance accountability and performance across large-scale commercial organizations, Journal of Frontiers in Multidisciplinary Research, 3(2), pp. 81–93. doi: https://doi.org/10.54660/.IJFMR.2022.3.2.81-93. Sakyi, J.K., Nnabueze, S.B., Filani, O.M., Okojie, J.S., and Okereke, M. (2022). Customer service analytics as a strategic driver of revenue growth and sustainable business competitiveness, Journal of Frontiers in Multidisciplinary Research, 3(2), pp. 109–123. doi: https://doi.org/10.54660/.IJFMR.2022.3.2.109-123. Shittu, I.S.M.A., Adeniji, I.O., Elumilade, R.A. et al. (2021). Selective coordination and arc-flash risk mitigation strategies in industrial power distribution systems, IRE, 4(8), p. 19. Sunday, E.A. and Omoegun, G.O. (2018). Integrating solar power solutions in small-scale manufacturing industries in Nigeria, International Journal of Scientific Research in Science, Engineering and Technology, 4(8), pp. 832–853. Sunday, E.A. and Omoegun, G.O. (2019). Optimizing electrical load distribution for hybrid solar installations in developing economies, International Journal of Scientific Research in Mechanical and Materials Engineering, 3(6), pp. 27–47. doi: IJSRMME19349. Sunday, E.A., Omoegun, G.O., Essien, M.A., and Oluokun, O.A. (2019). Thermodynamic efficiency and control strategies in residential air conditioning systems, International Journal of Scientific Research in Civil Engineering, 3(3), pp. 52–76. Too, E.G. and Weaver, P. (2014) ‘The management of project management: A conceptual framework for project governance’, International Journal of Project Management, 32(8), pp. 1382–1394. doi: https://doi.org/10.1016/j.ijproman.2013.07.006. Van Besouw, J. and Bond-Barnard, T.J., (2021). Smart project management information systems for engineering projects-project performance monitoring & reporting. Vandevoorde, S. and Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics, International Journal of Project Management, 24(4), pp. 289–302. doi: https://doi.org/10.1016/j.ijproman.2005.10.004.

More Articles from INTERNATIONAL JOURNAL OF SOCIAL SCIENCES AND MANAGEMENT RESEARCH

Building National Analytics Capacity: Advances and Future Pathways

Author: Uchechi Mary-Linda Unamma, Ifeanyichukwu Jeffrey Okwesa, Uzoamaka Iwuanyanwu

Root-Cause and Thematic Analysis for Major Incident Management: A Review

Author: Ifeanyichukwu Jeffrey Okwesa, Uchechi Mary-Linda Unamma, Uzoamaka Iwuanyanwu

Data-Quality and Single-Source-Of-Truth Frameworks for Inter- Agency Reporting: A Review

Author: Uchechi Mary-Linda Unamma, Ifeanyichukwu Jeffrey Okwesa, Uzoamaka Iwuanyanwu

Human-In-The-Loop Decision Systems: Advances and Future Directions

Author: Funmilayo Ashore-Onisemo, Uchechi Mary-Linda Unamma, Ifeanyichukwu Jeffrey, Okwesa,

Roles of Oil Subsidy Removal on Transportation Cost and Water Factory in Cross River South, Nigeria

Author: Onwuzurike Peter Tobechi, Owoh Akwa Owoh, Unoh Grace Inyang, Umaru Musa