References
Arshad M. N., Ab Malik Z. (2015). Quality of human capital and labour productivity: A case of Malaysia. International Journal of Economics, Management and Accounting, 23(1) Atkinson A. R. (1999). The role of human error in construction defects. Structural Survey, 17(4) Au-yong C. P., Ali A. S., Ahmad F. (2013). Office building maintenance: Cost prediction model. Gra?evinar, 65(9) Bheemaiah K., Smith M. J. (2015). Inequality, technology and job polarization of the youth labour market in Europe. Chang-Richards Y., Wilkinson S., Seville E., Brunsdon D. (2017). Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management, 24(1) Hossein K., Dadi G. B., Goodrum P., Srinivasan C. (2018). Impact of skilled labour availability on construction project cost performance. Journal of Construction Engineering and Management, 144(7) Hussain S., Fangwei Z., Ali Z. (2019). Examining influence of construction projects’ quality factors on client satisfaction using partial least squares structural equation modeling. Journal of Construction Engineering and Management, 145(5) Karimi H., Taylor T. R. B., Goodrum P. M. (2017). Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics, 35(6) Karimi H., Taylor T. R. B., Goodrum P. M., Srinivasan C. (2016). Quantitative analysis of the impact of craft worker availability on construction project safety performance. Construction Innovation, 16(3) Khan G. F., Sarstedt M., Shiau W. (2018). Methodological research on partial least squares structural equation modeling (PLS-SEM): An analysis based on social network approaches. Liepman K. (1960). Apprenticeship: An enquiry into its adequacy under modern conditions. Routledge. Love P. E. D., Li H. (2000). Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4) Mahamid I. (2011). Risk matrix for factors affecting time delay in road construction projects: Owners’ perspective. Engineering, Construction and Architectural Management, 18(6) Maloney W. F. (1983). Productivity improvement: The influence of labour. Journal of Construction Engineering and Management, 109(5) Meng X. (2012). The effect of relationship management on project performance in construction. International Journal of Project Management, 30(2) Muthuveloo R., Shanmugam N., Teoh A. P. (2017). The impact of tacit knowledge management on organizational performance: Evidence from Malaysia. Asia Pacific Management Review, 22(4) Naoum S. G. (2016). Factors influencing labour productivity on construction sites: A state-of-the- art literature review and a survey. International Journal of Productivity and Performance Management, 65(3) Neugart M., Schömann K. (2002). Why forecast and for whom? Some introductory remarks. In Forecasting labour markets in OECD countries: Measuring and tackling mismatches (Vol. 12, pp. 1–25). Cheltenham: Edward Elgar. Odeh A. M., Battaineh H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1) Paul H. K. Ho. (2016). Labour and skill shortages in Hong Kong’s construction industry. Engineering, Construction and Architectural Management, 23(4) Petersen D. C. (1971). Techniques of safety management. McGraw-Hill. Richter N. F., Gabriel C., José L. R., Ringle C. M. (2015). European management research using partial least squares structural equation modeling (PLS-SEM). European Management Journal, 33(1) Rigdon E. E. (2016). Choosing PLS path modeling as analytical method in European management research: A realist perspective. European Management Journal, 34 Ringle C. M., Sarstedt M., Mitchell R., Gudergan S. P. (2018). Partial least squares structural equation modeling in HRM research. The International Journal of Human Resource Management, 1 Ringle C. M., Sarstedt M., Straub D. (2012). A critical look at the use of PLS-SEM in MIS Quarterly. MIS Quarterly (MISQ), 36(1) Sarstedt M., Ringle C. M., Cheah J. H., Ting H., Moisescu O. I., Radomir L. (2019, January). Structural model robustness checks in PLS-SEM. Tourism Economics, 1(1) Sarstedt M., Ringle C. M., Hair J. F., Otto-von-guericke-universit M. S., Ringle C. M., Universit T., View S., Results C., Approaches C., Modeling S. E., View F. P., Sarstedt M. (2017). Partial least squares structural equation modeling. In Handbook of market research 1–40. Cham: Springer. Sarstedt M., Ringle C. M., Smith D., Reams R., Hair J. F. (2014). Partial least squares structural equation modeling (PLS-SEM): A useful tool for family business researchers. Journal of Family Business Strategy, 5(1) Saunders M., Lewis P., Thornhill A. (2015). Research methods for business students. Pearson. Schlägel C., Sarstedt M. (2016). Assessing the measurement invariance of the four-dimensional cultural intelligence scale across countries: A composite model approach. European Management Journal, 34(6) Shehata M. E., El-Gohary K. M. (2012). Towards improving construction labour productivity and projects’ performance. Alexandria Engineering Journal, 50(4) Sherekar V., Tatikonda M., Student M. (2016). Impact of factor affecting on labour productivity in construction projects by AHP method. International Journal of Engineering Science and Computing, 6(6) Shmueli G., Hair J. F., Ting H., Ringle C. M. (2019). Predictive model assessment in PLS-SEM: Guidelines for using PLSpredict. Shmueli G., Ray S., Manuel J., Estrada V., Chatla S. B. (2016). The elephant in the room: Predictive performance of PLS models. Journal of Business Research, 69(1) Slattery D. K., Sumner M. R. (2011). Leadership characteristics of rising stars in construction project management. International Journal of Construction Education and Research, 7(3) Stone M. (1974). Cross-validatory choice and assessment of statistical predictions. Journal of the Royal Statistical Society, 36(2) Tabassi A. A., Bakar A. H. A. (2009). Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran. International Journal of Project Management, 27(5) Wang Y., Bhanugopan R., Lockhart P. (2015). Examining the quantitative determinants of organizational performance: Evidence from China. Measuring Business Excellence, 19(2) Wang Y., Goodrum P. M., Haas C. T., Glover R. W. (2008). Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10) Wong J. M. W., Chan A. P. C., Chiangn Y. H. (2006). The changing construction labour market: A case of Hong Kong. Journal of Engineering, Design and Technology, 4(1) Wong M. J. (2006). Forecasting manpower demand in the construction industry of Hong Kong. The Hong Kong Polytechnic University. Xiao H., Proverbs D. (2002). The performance of contractors in Japan, the UK and the USA: An evaluation of construction quality. International Journal of Quality & Reliability Management, 19(6) Zou P. X. W., Zhang G., Wang J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6)