Ranking of Variables Influencing Construction Project

Mac-Barango, D.O & Nwogu, P. C

Abstract

Construction projects are successfully delivered when they are completed at targeted cost, time as well as meeting the required performance quality wise. The above assertion is often times more of an abstraction than reality. This research aims to identify several of those factors that inhibit project success with a view to ranking the degree of impact of these factors on project delivery time and consequently on success. The research using questionnaires as its instrument for data collection, obtains the personal data of the respondents as well as research components and other variables that influence project delivery. The research employed the statistical technique of percentile as well as central tendencies for the analysis of research components – (the variables influencing project delivery). The means score values of the variables formed the basis for the determination of the influencing variables. Research findings establishes as follows: (i) The mean score values of factors which contribute to delay in project delivery were between 2.26 to 4.02, where unfavourable economic policies with the value of 4.02 is the most critical and client’s understanding of design, procurement and construction processes with a value of 2.26 is the least. (ii) Other factors that impact on project delivery time had mean scores between 2.93 to 3.96, this include unfavourable physical conditions, inadequate design, incomplete and late information quality management and so on. The research concludes that attaining project objectives at first budget and scheduled time is more of an abstract than reality and as such it important to put into cognizance the components and variables as established in this study. The research recommends and exploratory study on other aspects/factors affecting project delivery time and successful implementation.

Keywords

(i) Projects (ii) Construction Projects (iii) Successful Projects (iv) Target cost (v)Scheduled Time (vi) Project Success Determinants.

References

Aibinu and Jagboro, G. O. (2002): The Effect of Construction Delays on Project Delivery in Nigeria Construction Industry. International Journal of Operations and Project Management 20 (4). 593-599. Andi and Minator, T (2003): Representing Causal Mechanism of Defective Designs. A 254 System Approach Considering Human Errors. Journal of Construction Management and Economics 21, 297-305. Arditi and Mochtar (2002): Trends in Productivity Improvement in the US Construction Industry. Assaf, S. A and Al-hejji, S. (2006): Causes of Delays on Large Construction Projects. International Journal of Operations and Project Management 24 (7). 249-237. Baldwin, J. R. and Manlhei, J. M (1971): Causes of Delays in the Construction Industry. ASCE journal of the Construction Division 92, 177-187. Belout, A and Gauvreau, C (2004): Factors Influencing Project Success. The impact of Human Resources Management. International Journal of Project Management 22 (1), 1-111. Bromillow, F. J. Hinds, M. F. and Moody, N. F (1988). The Time and Cost Performance of Building Contracts 1976-1986. The Austainian Institute of Quantity Surveyors. Sydney. Chan, A. P. C, Scott D. and Chan A. P. I. (2004). Factors Affecting the Success of a Construction Project. Journal of Construction Engineering and Management ASCE 130 (1), 153-155. Cheung (2004): Demystifying Stakeholders Commitment and its Impact on Construction Projects. Chinyo and Akintoye (2008): Practical Approaches for Engineering Stakeholders. Findings from UK Construction Management and Economics 26, 591-599. Cooke-Davis, T (2001). The Real success factors on projects. International journal of project management 20 (3). 185-190. Cox (2003): Management’s Perception of Key Performance Indicators for Construction. Journal of Construction Management and Economics 21, 209-218. Fagbenle, O. I, Adeyemi A. Y. and Adesanya, D. A (2004). The Impact of Non-Financial Incentives on Bricklayers Productivity in Nigeria. Construction Management and Economics 22, 899-911. Faridi, A. S and el-Sayegh, S. M. (2006): Significant Factors Causing Delay in UAE Construction Industry. Journal of Construction Management and Economics 22, 899- 911. Frimpong, Y, Oluwoye, J and Crawford, I (2003): Causes of Delay and Cost Overruns in Construction of Groundwater Projects in Developing Countries. Ghana as a case study. International Journal of Project Management 21, 321-326. https://www.researchgate.net/pulication/22652151. Koushki, P. A, Al-Rashidi, K. and Karton, N. (2005): Delays and Cost Increases in the Construction of Private Residential Projects in Kuwait. Construction Management and Economics 23, 285-294. Koushki, P. A. and Karton, N. (2004): Impact of Construction Materials on Project Time and Cost in Kuwait. Engineering Construction and Architectural Management 11 (2), 126-132. Lavagnon, A.I(2009): Project success as a topic in project management journals project management journal 40(4) 6-19 December 2009: accessed online Mac-Barango, D. O. (2016): Severity Rank of Factors Affecting Construction Cost by Client, Consultants and Contractors. International Journal of Economic and Financial Management. Vol. 3:1, pp 1-13. Available at http:www.-36: Accessed on line www.dergipark.org.tr.en/download/article. Sloanman, S. P. (2008): Economic and Business Environment 2 nd Ed. London. Prentice Hall. Sullivan, A and Harris, F. C. (1986): Delays on Large Construction Projects. International Journal of Operations and Production Management 6 (1), 25-33. Tam, C. M, Deng, Z. M and Zeng, S. X. (2002): Evaluation of Construction Methods and Performance for High Rise Public Housing Construction Hong Kong. Building and Environment 37 (10) 983-991. Zayed, T. M, Halpin, D. N. and Basha, I (2005). Productivity and Delays Assessment for Concrete Batch Plant-Truck. Mixer Operations. Construction Management and Economics 23. 839-850.

More Articles from WORLD JOURNAL OF FINANCE AND INVESTMENT RESEARCH