References
Adetona, F. O. (2016). Fraud and Corruption in Construction in Construction Contracts in Nigeria. Quantity Surveyor. Vol. 62 (1), 11-18. Aibinu, A. A and Jagboro, G. O. (2002). The effects of construction delays on project delivery in the Nigerian construction industry. International Journal of Project Management 20: 593-599 Aje, O. I. Omoraka, A. O and Ariyo, E. I (2015). Assessment of Factors Inhibiting Cost Performance of Construction Projects in Nigeria. Quantity Surveyor. 60(1): 21-31. Arditi, D. Akan, G. T and Gurdamar, S (1985). Reasons for Delays in Public Projects in Turkey. Construction Management and Economics. Vol. 3 (1), pp 171-181. Azhar, N, Farooqui, R. U and Ahmed, S. M (2008). Cost Overrun Factors in Construction Industry of Pakistan. Advancing and Integrating Construction Education, Research and Practice. Aziz, A. A, Memon, A. H, Rahman, I. A and Karim, A. T (2013). Controlling Cost Overrun Factors in Construction Projects in Malaysia. Research Journal of Applied Sciences, Engineering and Technology. 5 (8). Cartridge, D (2009). Quantity Surveyors Pocket Book. First Edition. Butterworth-Heinemann. Elsevier. Oxford. P1. Chan, S and Park, M (2005). Project Cost Estimation. Using Principal Component Regression. Construction Management and Economics 23. 295 – 304. Chartered institute of builders (2002). Code of Practice for Project Management and Development. 3rd Edition. Blackwell Publishing Oxford. Chitkara, K. K. (2011). Construction Project Management. Planning, Scheduling and Controlling. Second Edition. Tata. Mc-Graw Hill. Elinwa, U and Silas, B. (1993). Construction Factors in Nigeria. Journal of Construction Engineering and Management. 119 (4). 698 – 714. Eyo-Ita-Eyo (2001). Nigerian Cement Industry is Pathetic. THISDAY People, Leaders and Company Limited. http:www.thisdayonline.com accessed May 2016. Fisk, E. R. (1982). Construction Project Administration Second Edition. John Wiley and Sons. New York, Chichester, Toronto. Fisk, E. R. (1997). Construction Project Administration. 5th Edition. Prentice Hall, New Jersey. Frimpong, Y, Oluwoye, J and Crawford, L (2003). Causes of Delays and Cost Overruns in Construction of Ground Water Projects in Developing Countries. Ghana, as a case study. International Journal of Project Management 21: 321-326. Gould, F. E. (2002). Managing the Construction Process. Estimating, Scheduling and Project Control. Upper Saddle River. Prentice Hall. Husseini, A. A. (1991). Construction and the National Economy. The Nigerian Quantity Surveyor. 20-21. Kangari, K. (1989). Business Failure in Industry. Journal of Construction Engineering and Management. 115(2) 173-187. Leibing, R (2001). The Construction Industry: Process Players, Upper Saddle River. NJ: Prentice Hall. Mandfield, N. R. Uguw, O. O and Doran, T. (1994). Causes of Delay and Cost Overrun in Nigeria Construction Projects. International Journal of Project Management 12(4): 254- 260. MC Caffer R and Baldwin, A (1986). Estimating and Tendering for Civil Engineering Works. Collins Professional and Technical Books. Granada Publishing. Memon, A. H and Rahman, I. A (2014). Sem-Pls Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia. Perspective of Clients and Consultants. The Scientific World Journal. Memon, A. H, Rahman, I. A and Aziz, A. A (2012). The Causes Factor of Large Projects Cost Overrun. A Survey in the Southern Part of Penninsular Malaysia. International Journal of Real Estate Studies. 7(2): 1-15. Memon, M. H, Rahman, I. A. Abdullahi, M. R and Aziz, A. A (2010). Construction Cost Performance in Project Management Projects. Case of major Large Projects. Proceedings of Post Graduate Seminar on Engineering Technology and Social Science. University tun Hussein Onn Malaysia. Ogunlana, S. Krit, P and Vithood, J (1996). Construction Delays in a Fast Growing Economy. Comparing Thailand with Other Economics. International Journal of Project Management 14(1): 37-45. Omoreigie, A and Radford, D (2006). Infrastructure Delay and Cost Escalations. Causes and Effects in Nigeria. School of Architecture, De Montford University. Leicester, LEI 913H England. Songer, A. D and Molenaar, K. R (1997). Project Characteristics for Successful Public Sector Design-Build. Journal of Construction Engineering and Management. Vol. 123(1). Pp 34-30. Wheater, C. P. and Cook, P. A (2003). Using Statistics to Understand the Environment. Routledge 270. Medison Ave, New York.