References
Akhnoukh, A.K., Bonilla, M., Findley, D. Rasdorf, W. & Norbage, N. (2022). Constructability Review Effectiveness. Draft Final Report of the North Carolina Department of Transportation Research and Analysis Group. Al-Bdairi, M.M., Naji, J.M.A. & Abed, H.K.(2025). Recent trends and challenges in project management of oil and gas projects: a systematic review. Iraqi Journal of Oil & Gas Research, Vol. 05, No. 02 (2025), 51-58. DOI: http://doi.org/10.55699/ijogr.2025.0502.1089. Aldhaheri, M.S.O. (2016). Effectiveness of Engineering, Procurement And Construction Major Projects in Abu Dhabi's Oil And Gas Industry: End User’s Perspective'. A Doctor of Business Administration Thesis of the United Arab Emirates University. 689. https://scholarworks.uaeu.ac.ae/all_theses/689. AlNoaimi, F.A. & Mazzuchi, T.A. (2021). Risk Management Application in an Oil and Gas Company for Projects. International Journal of Business Ethics and Governance . Vol4, No 3, 1-30. DOI: 10.51325/ijbeg.v4i3.77. Alyatama, M.A.I. (2021). Application of agile project management in Kuwait oil and gas capital projects. A Doctor of Business Administration of the University of Northampton. Amade, B., Ogbonna, A.C. & Kaduru, C.C. (2012). Determinants of successful project implementation in Nigeria. International Journal of Management Sciences and Business Research (1)6, 1-16. Baharudin, I. S., Abdullah, B., Mohd Salleh, N. A. & Shariffudin, P. (2020). A Case Study on Change Management Readiness for an Oil & Gas SME Company in Malaysia. IOP Conf. Series: Materials Science and Engineering IOP Conf. Series: Materials Science and Engineering 834, 1-14. (2020) 012048. IOP Publishing. doi:10.1088/1757- 899X/834/1/012048. Berends, K. (2007). Engineering and construction projects for oil and gas processing facilities: Contracting, uncertainty and the economics of information. Energy Policy 35 (2007) 4260– 4270. doi:10.1016/j.enpol.2007.02.027. Blomquist, T., Hällgren, M., Nilsson, A. & Söderholm, A. (2010). Project-as-practice: In search of project management research that matters. Project Management Journal © 2010 by the Project Management Institute. 1-12. DOI: 10.1002/pmj.20141. Denni-Fiberesima, D. & Rani, N.S.A. (2011). An evaluation of critical success factors in oil and gas project portfolio in Nigeria. African Journal of Business Management Vol.5 (6), pp. 2378-2395. DOI: 10.5897/AJBM10.1129. Efebeli, T.V. (2021). Strategies for Reducing Project Cost Overruns in the Oil and Gas Construction Industry. A DBA dissertation of Walden University. Elhoush, R. & Kulatunga, U. (2018). The effectiveness of project risk management: a study within the Libyan oil and gas industry. ID 138. Retrieved from googlescholar on 5th April, 2025. Gholami, B.O.F. (2018). A Framework for Enhancing Engineering Deliverables to Improve Construction Performance in Oil and Gas Projects. A Doctoral thesis of the University of Calgary, Calgary, Canada. Retrieved from https://prism.ucalgary.ca.http://hdl.handle.net/1880/109395. Ilieş, L., Crişan, E. & Mureşan, I.N. (2010). Best Practices in Project Management. Review of International Comparative Management Volume 11, Issue 1, March 2010 43-51. Kanu, M.O., Dienagha, I.N., Digitemie, W.N., Ogu, E. & Egbumokei, P.I. (2022). Optimizing Oil Production through Agile Project Execution Frameworks in Complex Energy Sector IJEMT Challenges, International Journal of Multidisciplinary Research and Growth Evaluation. Volume: 03, Issue: 01, Page No: 769-775. DOI: https://doi.org/10.54660/.IJMRGE.2022.3.1.769-775. Kraidi, L., Shah, R., Matipa, W. & Borthwick, F. (2018). An analysis of the critical risk factors in oil and gas pipeline projects using a comprehensive risk management framework. The ARCOM 2018 Conference, Belfast, UK, 3-5 September 2018. 361-369. Maina, C. & Gathenya, J. (2014). Influence of Economic Factors on Performance of Project Management among Petroleum Marketing Firms in Kenya. International Journal of Academic Research in Business and Social Sciences June 2014, Vol. 4, No. 6 ISSN: 2222- 6990. Mayes, R.E. & Tucker, J. (2024). Best Practices for Aligning Projects with Corporate Strategic Objectives in the Financial Technology Industry. Retrieved from googlescholar on the 5th of July, 2025. Mejlænder-Larsen, Ø. (2015). Using a change control system and BIM to manage change requests in design. Proceedings of the 32nd International CIB W78 Conference; 549-558. Mojarad, A.A.S., Atashbari, V. & Tantau, A. (2018). Challenges for sustainable development strategies in oil and gas Industries. DOI: 10.2478/picbe-2018-0056, pp. 626-638, ISSN 2558-9652| Proceedings of the 12th International Conference on Business Excellence 2018. Odida, C.O. (2011). Strategic change management in the downstream petroleum industry in Kenya. A Master’s Thesis of the University of Nairobi. Okonkwo, O.C. (2026). An evaluating the industry best practices for project performance in oil and gas industry in Rivers state, Nigeria. A Master’s thesis of the Federal University of Technology, Owerri, Nigeria. Onukwulu, E.C., Dienagha, I.N., Digitemie, W.N., Egbumokei, P.I. & Oladipo, O.T. (2024). Advanced supply chain coordination for efficient project execution in oil & gas projects. International Journal of Multidisciplinary Research and Growth Evaluation Volume 05, Issue 04, 1255-1272. Sawalim, K.M.H. (2014). Appraising Project performance and Total Quality Management practices in the Libyan oil and gas sector. A PhD thesis of the Liverpool John Moores University. Seddeeq, A.B., Assaf, S., Abdallah, A. & Hassanain, M.A. (2019). Time and cost overrun in the Saudi Arabian oil and gas construction industry. Buildings 2019, 9, (41); doi:10.3390/buildings9020041. Suda, K.A., Rani, N.S.A., Rahman, H.A. & Chen, W. (2015). A review on risks and project risks management: oil and gas industry. International Journal of Scientific & Engineering Research, Volume 6, Issue 8, 938- 943. Vasista, T. G. & AlSudairi, M. A. T. (2018). Managing through Computer Aided Quality Control in Oil & Natural Gas Industry Project Sites. Journal of Advanced Research in Dynamical & Control Systems, Vol. 10, 04-Special Issue, 2018, 896-905. Weijde, G.A. van der (2008). Front-End Loading in the Oil and Gas Industry. Towards a Fit Front- End Development Phase. A Master’s thesis of the Delft University of Technology. Yi, D., Lee, E. & Ahn, J. (2019). Onshore Oil and Gas Design Schedule Management Process Through Time-Impact Simulations Analyses. Sustainability 2019, 11, 1613; 1-19. doi:10.3390/su11061613 www.mdpi.com/journal/sustainability.