References
Abunyewa, R. A., & Amoako, E. O. (2015). Challenges of implementing development plans in Ghana: a case study of the Tamale Metropolitan Assembly. Journal of Sustainable Development, 8(4), 82-91. Adams, D. K (2017). Development Policy. Comparative Strategy Review.Vol.21 No.2 &3 June/ October; pp.296-310 Adams, D., & Tiesdell, S. (2022). Shaping places: urban planning, design and development. Routledge. Adamu, M. D. (2019). Evaluation of the implementation of Federal housing policy in 21 local government areas of Adamawa State, North East Nigeria. Ophthalmic Epidemiology, 30(6), 599-607. Adebayo, D. (2020). Nigeria’s Faltering Anti-Corruption War. Africa is a Country publication. https://africasacountry.com/nigerias-faltering-anticorruption-war Adegoke, S. (2011). Evaluation of antioxidant activity of Tetracarpidium conophorum (Müll. Arg) Hutch & Dalziel leaves. Oxidative Medicine and Cellular Longevity, 2011. Agboola, T. (2019). The Housing of Nigerians: A Review of Policy Development and Implementation. Research Report No. 14, Ibadan, Development Policy Centre. Ahmed, Atan Bin Sipan, and Hashim (2020). Preliminary identification of potential vaccine targets for the COVID-19 coronavirus (SARS-CoV-2) based on SARS-CoV immunological studies. Viruses, 12(3), 254. Ahmed, D.A. (2020). The changing role of the higher civil service in the political and administrative developments of Nigeria. Msc thesis in public administration, university of Liverpool (280). Akhtar, M., Mufti, N. A., Mubin, S., Saleem, M. Q., Zahoor, S., &Ullah, S. (2023). Identification of Various Execution Modes and Their Respective Risks for Public–Private Partnership Infrastructure Projects. Buildings, 13(8), 1889. Akujuru, C. & Enyioko, N. (2019). The impact of N-power programmes on poverty alleviation in Nigeria: a study of Rivers State, Global Journal of Political Science and Administration, 7 (3), 29-50. Akujuru, C. A. &Enyioko, N. C. (2022). Ease of doing business policy and efficiency of public enterprise in Nigeria. International Journal of Research and Innovation in Social Science , VI, XI, 501-530 Akukwe, T. & Ogbodo, C. (2015).Spatial Analysis of Vulnerability to Flooding in Port Harcourt Metropolis, Nigeria.SAGE Open, 2015. Alinaitwe, H., & Ayesiga, R. (2013). Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries. Aliogo, U. (2021). Nigeria: Assessing Buhari’s Anti-Corruption War. This Day Online, 30 December. https://allafrica.com/stories/2021 12300139.html Almarri, K. & Boussabaine, H. (2023).Critical success factors for public–private partnerships in smart city infrastructure projects. Construction Innovation Ltd Cupress, Ghana. Alshamrani, O. S. D., Saleem, M., Al Yousif, I. K., &Alluqmani, A. (2023). Development of a pre-qualification and selection framework for construction projects’ contractors in Saudi Arabia. Journal of Asian Architecture and Building Engineering, 22(3), 1545-156 Amenaghawon, J. &Ilo, U. J. (2016). In Nigeria, many Anticorruption Policies and Lots of Corruption, Too. Open Society, June 29. https://www.opensocietyfoundations.org/voices/ E-ISSN 2504-883X P-ISSN 2695 2432 nigeria-many-anticorruptionpolicies-and-lots-corruption-too CBN (2015). Revised Guidelines for compliance with Treasury Single Account by Banks in Nigeria American Planning Association.(2015). Planning and urban design standards.John Wiley & Sons. Amović, G., Maksimović, R., &Bunčić, S. (2020). Critical success factors for sustainable public-private partnership in transition conditions: An empirical study in Bosnia and Herzegovina. Sustainability, 12(17), 7121. Anele, K.A. (2017). The ghost worker in the Rivers State public service: A study of institutionalized fraud. Unpublished Ph.D thesis, university of Port Harcourt (120). Anyanwu, C. (2018). The Growth of Port Harcourt: 1912-1960. In Ogionwo W., The City of Port Harcourt. A Symposium on its Growth and Development. Ibadan: Heinemann Educational Books Nigeria Limited.15-34. Appiah, G. (2016). Why has Plan Implementation been ineffective in Ghana? A Case Study of Planning in the Kwabre East District Assembly and Offinso Municipal Assembly. Minnesota State University, Mankato. Arslan, A., Golgeci, I., Khan, Z., Al-Tabbaa, O., &Hurmelinna-Laukkanen, P. (2021). Adaptive learning in cross-sector collaboration during global emergency: conceptual insights in the context of COVID-19 pandemic. Multinational Business Review, 29(1), 21-42. Asiodu, P.C. (2018). The future of the federal and state civil services in the context of the twelve states structure. BNC Benin City (110). Awa, A. (2020) decisional deprivation, equilibrium and saturation as variables in educational research. working paper No 93, state university of New York at Buffalo (410). Barrett S, Fudge C, (2021) Policy and Action: Essays in the Implementation of Public Policy (Methuen, London) Batra, R. (2023). Review of public–private partnerships across building sectors in nine European countries: Key adaptations for PPP in housing. Engineering, Construction and Architectural Management, 30(7), 2904-2927. Berke, P., Backhurst, M., Day, M., Ericksen, N., Laurian, L., Crawford, J., & Dixon, J. (2022) What makes plan implementation successful? An evaluation of local plans and implementation practices in New Zealand. Environment and Planning B: Planning and Design, 33(4), 581–600 Berke, P., Backhurst, M., Day, M., Ericksen, N., Laurian, L., Crawford, J., and Dixon, J. (2022) What makes plan implementation successful? An evaluation of local plans and implementation practices in New Zealand. Environment and Planning B: Planning and Design, 33(4), 581–600 Berke, P., Backhurst, M., Day, M., Ericksen, N., Laurian, L., Crawford, J., & Dixon, J. (2016) What makes plan implementation successful? An evaluation of local plans and implementation practices in New Zealand. Environment and Planning B: Planning and Design, 33(4), 581–600 Berke, Philip R., Neil Ericksen, Jan Crawford, and Jenny Dixon. (2022) “Planning for Indigenous People: Human Rights and Environmental Protection in New Zealand.” Journal of Planning Education and Research 22 (2): 115–34. Berke, Philip, and David Godschalk. (2016) “Searching for the Plan: A Meta-analysis of Plan Quality Studies.” Journal of Planning Literature 23 (3): 227–40. Bertoldi, P., Economidou, M., Palermo, V., Boza‐Kiss, B., & Todeschi, V. (2021). How to finance energy renovation of residential buildings: Review of current and emerging E-ISSN 2504-883X P-ISSN 2695 2432 financing instruments in the EU. Wiley Interdisciplinary Reviews: Energy and Environment, 10(1), 38-64. Black, D. V. (2020). Project Aims: Implementation Plan. Artherton Press, New York Black, D.V. (2025). Project Aims: “Implementation Plan”. Burby R, May P, Paterson R, (1998). ``Improving compliance with regulations: choices and outcomes for local government'' Journal of the American Planning Association 64 324 – 334 Burby, Raymond J. (2023) “Making Plans That Matter: Citizen Involvement and Government Action.” Journal of the American Planning Association 6;9 (1): 33–49 Caiden, B.A. (2019). The functions of the executive. Cambridge Massachusetts, Harvard university press (460).