Managing Project Communications in Integrated Project Delivery Process

Prof. Reuben A. Okereke Ekenze Munachimso Ifeanyi Egemonu Bismarck Chibuike

Abstract

Communication can be considered as one of the foundations of successful project implementation especially when it is used in complex contexts of the Integrated Project Delivery . IPD is an interdisciplinary paradigm that integrates people, systems, organizational processes and operational practices into one unified and cohesive process, thus, prefiguring the early involvement of key stakeholders, equitable distribution of risk, reward and shared decision making. In this kind of a synergistic environment, the project communication management plays a very important role: it will ensure that the all the stakeholders, including the owners, designers, contractors, and suppliers are kept in a synchronized and well informed and active state throughout the project lifecycle. This treatise challenges the principles, strategies and best practices regulating the management of communications in the IPD model. It also examines the suite of tools and methods to support a smooth flow of information, coordination, and real-time collaboration including digital platforms, information management systems, and standardized communication protocols. The study also outlines typical communicative barriers that are inherent in IPD projects such as ideological differences, information flood, conflicting stakeholder interests and technological integration issues. It provides pragmatic resolutions which are meant to reduce these challenges. In addition, the analysis highlights the necessity of the systematic communication-management plan to create transparency, accountability, and effective discussion. Through the assessment of real-life case studies, the study proves that effective communication governance raises the level of project performance, reduces conflicts, minimizes delays, and accelerates the achievement of project goals. Overall, this academic study sheds some light on the strategic inelasticity of communication in 3IPD projects and provides practical advice to the practitioners, st

Keywords

Integrated project deliveryproject communication managementcollaborationinformation management systemsstakeholder engagement

References

Akhavian, R., & Behzadan, A. H. (2016). Smartphone-based construction workers’ activity recognition and classification. Automation in Construction, 71, 198–209. American Institute of Architects . (2014). Integrated Project Delivery: A guide. AIA National. Azhar, S., Kang, Y., & Ahmad, I. (2015). Critical success factors for Building Information Modeling implementation. Construction Innovation, 15(3), 324–351. Barlish, K., & Sullivan, K. (2012). How to measure the benefits of BIM—A case study approach. Automation in Construction, 24, 149–159. Bryde, D., Broquetas, M., & Volm, J. M. (2013). The impact of BIM on project performance. International Journal of Project Management, 31(7), 971–980. Cain, C. T. (2013). Performance measurement for construction project management. Wiley- Blackwell. Chen, H., & Luo, L. (2014). BIM-based communication and coordination in IPD projects. Journal of Construction Engineering and Management, 140(9), 1–10. El-Sabek, L. M., & McCabe, B. (2018). Coordination challenges in construction megaprojects: The role of communication management. Journal of Management in Engineering, 34(2), 04017064. Forgues, D., Koskela, L., & Lejeune, A. (2017). Value creation through communication in integrated project delivery. Lean Construction Journal, 45–58. Kent, D. C., & Becerik-Gerber, B. (2010). Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), 815–825. Kreider, R. G., & Messner, J. I. (2013). BIM execution planning guide. Pennsylvania State University, Computer Integrated Construction Research Program. Love, P. E. D., Edwards, D. J., & Irani, Z. (2012). Moving beyond optimism bias and strategic misrepresentation: An explanation for inaccurate cost forecasts. IEEE Transactions on Engineering Management, 59(4), 560–571. Mesa, H. A., Molenaar, K. R., & Alarcón, L. F. (2016). Comparative analysis of performance of IPD projects in the United States. Journal of Construction Engineering and Management, 142(12), 1–10. Olatunji, O. (2011). Modelling the costs of corporate implementation of BIM. Journal of Financial Management of Property and Construction, 16(3), 211–231. Sacks, R., Eastman, C., Lee, G., & Teicholz, P. (2018). BIM Handbook: A guide to Building Information Modeling (3rd ed.). Wiley. Succar, B., Sher, W., & Williams, A. (2013). An integrated performance framework for BIM implementation. Automation in Construction, 46, 1–12. Turk, Ž. (2016). Ten questions concerning Building Information Modelling. Building and Environment, 107, 274–284. Zhang, L., He, J., & Zhang, M. (2015). Integrated project delivery for infrastructure projects: A review. Procedia Engineering, 123, 598–606.

More Articles from IIARD INTERNATIONAL JOURNAL OF GEOGRAPHY AND ENVIRONMENTAL MANAGEMENT