Submit your papersSubmit Now
For Enquiries: [email protected]
IIARD LogoIIARD

Scatter Diagram Quality Control Tool for Enhancing Effective Building Project Delivery in Bayelsa State, Nigeria

Julius Atose, Diepiri Nimi, A, Ekwueme Richard Wokocha, Tamunofonyama Danagogo

Abstract

This study is on scatter diagram quality control tool for enhancing effective building project delivery in Bayelsa State with the aim of determining whether the use of scatter diagram as a quality control tool enhances effective building project delivery in Bayelsa State. The population for the study was 188, consisting of building professional lectures in tertiary institutions and 105 building professionals in ministries, departments and authorities in Bayelsa State. The study adopted analytical descriptive survey design. Questionnaire was used to collect needed data from the respondents, using 4-point Likert rating scale. Cronbach Alpha method was used for testing the reliability of the instrument and reliability coefficient of 0.79 was obtained. The research question was answered using the mean and standard deviation while t-test statistics was used to test the null-hypothesis at 0.05 level of significance. Finding revealed that scatter diagram as quality control tool enhances effective building project delivery in Bayelsa State. Result obtained showed that there was no significant difference in the mean response score of both building professional lecturers in tertiary institutions and building professionals in ministries, departments and authorities on scatter diagram as a quality control tool for enhancing effective building project delivery in Bayelsa State. Therefore, it was concluded that scatter diagram is quality control tool for effective building project delivery. Based on the findings, it was recommended that building construction professionals be encouraged to adopt and implement the use of scatter diagram as a quality control tool for enhancing effective project delivery in Bayelsa State.

Keywords

QualityQuality Control and Scatter Diagram

References

Behnam, N. (2017). Seven basic tools of quality control: the appropriate techniques for solving quality problems in the organization. Kanazawa: Kaoru Ishikawa Press Bustani, S. (2014). Quality control mechanism in building production management. New York; McGraw-Hill Press. Emmanuel. A. & Isaac, A. (2014). Knowledge and usage of scatter quality control tool by producers of precast concrete products in Ghana. Journal of Construction project management and innovation, 4(2),966-995. Fox, E (2013). Formal model of quality and Iso9000 compliance: An information systems approach. Retrieved15th December,2023. from https//www.researchgate.net/publication/2391588. Gray, C.F, & Larson, E.W. (2014). Project management: The Managerial process: New York, NY: McGraw Hill. Mane, P & patil S. (2015). Quality management at construction project. Carlsbad, USA: CPI Press. Mitra, A. (2016). Fundamental of quality control and improvement. Boca Raton, USA: John Wiley and Sons. Montgomery, D. C. (2009). Introduction to statistical quality control.6th edition. Danvers, USA. John Willey and sons, Inc. Samiksha, S. (2020). Quality assurance and quality control for project effectiveness in construction and management. International Journal of Quality and Reliability Management, 7,146-150 Wikipedia, (2023). What is construction? Different types and importance. Retrieved 4th December, from https://www.goconstruct.org.

More Articles from INTERNATIONAL JOURNAL OF ENGINEERING AND MODERN TECHNOLOGY