References
Abdullah, M.R., Rahman, I.A. & Azis, A.A.A. (2010). Causes of delay in MARA management procurement construction projects. Journal of Surveying, Construction & Property, 1(1), 23–138. Abdulghafour, A.B. & Salman, K. (2023). Delays of construction projects in Makkah from the point of view of the consultant. Journal Umm Al-Qura University of Engineering and Architecture, 1-13. https://doi.org/10.1007/s43995-023-00024-2. Abisuga A.O., Amusu O.R.O, & Salvador (2014). Construction delays in Nigeria: a perception of indigenous and multinational construction firms. Journal of Emerging Trends in Economics and Management Sciences (JETEMS) 5(3),371- Aibinu, A. & Jagboro, G. (2002). The effects of construction delays in projects delivery in Nigerian construction industry. Doloi, H., Sawhney, A., Iyer, K.C. & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489. doi: 10.1016/j.ijproman.2011.10.004. El-Razek, M.E.A., Bassioni, H.A. & Mobarak, A.M. (2008). Causes of delay in large building construction projects. Journal of Construction Engineering and Management, 134(11), 831–841. Enshassi, A., Kumaraswamy, M. & Jomah, A.N. (2010). Significant factors causing time and cost overruns in construction projects in the Gaza Strip: contractors’ perspective. International Journal of Construction Management 10 (1), 35–60. Fallahnejad, M.H. (2013). Delay causes in Iran gas pipeline projects. International Journal of Project Management, 31(1), 136-146. doi: 10.1016/j.ijproman.2012.06.003. Götz, O., Liehr-Gobbers, K. & Krafft, M. (2010). Evaluation of structural equation models using the partial least squares (PLS) approach. In handbook of partial least Squares; Springer: Berlin/Heidelberg, Germany, 691–711. Hailu, A.Y., Mohammed, I., Alemu, D. & Gesese, A. (2023). Construction project delay factors of public universities in Ethiopia: a structural equation modeling approach. Journal of Economics, Management and Trade, 29(3), 16-34. DOI: 10.9734/JEMT/2023/v29i31081. Hair Jr, J.F., Sarstedt, M., Matthews, L.M. & Ringle, C.M. (2016). Identifying and treating unobserved heterogeneity with FIMIX-PLS: PartI–method. European Business Review, 28, 63–76. Hair, J.F., Risher, J.J., Sarstedt, M. & Ringle, C.M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31, 2–24. Kim, J. & Bilbao, P. (2023). Why are the frequently reported delay factors in construction projects recurring? a qualitative study. International Journal of Sustainable Construction Engineering and Technology, 14(1), 21-31. DOI: https://doi.org/10.30880/ijscet.2023.14.01.003. Kumaraswamy, M.M. & Chan, D.W.M. (1999). Factors facilitating faster construction. Journal of Construction Procurement, 5(2), 88-98. Le-Hoai, L., Lee, Y.D. & Lee, J.Y. (2008). Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6), 367–377. Mäntysaari, P. (2017). The research question, theories and methods. Chapter First Online: 29 March 2017. Mejía, G., Sánchez, O., Castañeda, K. & Pellicer, E. (2023). Stakeholders’ issues as a source of project delays: a meta-analysis between building and road projects. Revista de la Construcción. Journal of Construction, 22(1), 51-73. https://doi.org/10.7764/RDLC.22.1.51. Memon, A.H., Memon, A.Q., Khahro, S.H. & Javed, Y. (2023). Investigation of project delays: towards a sustainable construction industry. Sustainability, 15, 1457. https://doi.org/10.3390/su15021457. Muhwezi, L., Acai, J. & Otim, G. (2014). An assessment of the factors causing delays on building construction projects in Uganda. International Journal of Construction Engineering and Management 3(1), 13–23. Nadeem, M., Jiskani, I.M., Urwat, M.S., Uddin, S., Akhtar, K. & Khokhar, N.H. (2023). Analysing delay factors in construction projects using Z number approach: Insights from Pakistan. Canadian Journal of Civil Engineering, 1-26. Odeh, A. M. & Battaineh, H. (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 20(1), 67-73. Odeh, M. and Battaineh, H.T. (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 20(1), 67-73. doi: 10.1016/S0263- 7863(00)00037-5. Ogunlana, S.O. & Promkuntong, K. (1996). Construction delay in fastgrowing economy: comparing Thailand with other economies. International Journal of Project Management, 14(1), 37-45. Okpala, D.C. & Aniekwe, C.C. (1988). Causes of high cost of construction in Nigeria. Journal of Construction Engineering and Management, 114(2), 233-244. Okumbe, J.O. & Vertse (2008). Construction industry perspective on causes and effects of delays in South Africa. Proceedings of the Construction and Building Research Conference of the Royal Institute of Chartered Surveyors held at Dublin Institute of Technology, pp.4-5. Olusegun, E.A. & Akintunde, A. (2012). Stakeholders’ perspective of the causes and effects of construction delays on project delivery. KICEM Journal of Construction Engineering and Project Management, Online ISSN 2233-9582. Osei-Kyei, R. (2017). A best practice framework for public–private partnership implementation for infrastructure development in Ghana. A PhD thesis of the Hong Kong Polytechnic University. Oyegoke, A.S. & Al Kiyumi, N. (2017). The causes, impacts and mitig