References
Aibinu, A.A. & Jagboro, G.O. (2020) “The Effects of Construction Delays on Project Delivery in Nigerian Construction Industry”. Journal of Project Management, 20(8), pp.593-599 Albert, A., Hallowell, M., Kleiner, B., Chen, A. and Golparvar-Fard, M. (2014). Enhancing Construction Hazard Recognition with High-Fidelity Augmented Virtuality. Journal of Construction Engineering and Management, 140(7). Annamalaisami, C.D. and Kuppuswamy, A. (2019), “Reckoning construction cost overruns in building projects through methodological consequences”, International Journal of Construction Management, Vol. 22 No. 6, pp. 1079-1089. Asamaoh, R.O. and Offei-Nyako, K. (2013), “Variation determinants in building construction: Ghanaian professionals’ perspective”, Journal of Construction Engineering and Project Management, Vol. 3 No. 4, pp. 20-25. Asiedu, R.O. and Ameyaw, C. (2021), “A system dynamics approach to conceptualize causes of cost overrun of construction projects in developing countries” International Journal of Building Pathology and Adaptation, Vol. 39 No. 5, pp. 831-851. Bae, H., Golparvar-Fard, M. and White, J. (2013), “High-precision vision-based mobile augmented reality system for context-aware architectural, engineering, construction and facility management (AEC/FM) applications”, Visualization in Engineering, Vol. 1 No. 1, pp. 1-13. Behzadi, A. (2016). Using augmented and virtual reality technology in the construction industry. American Journal of Engineering Research, 5(12), pp. 350-353. Cartwright, D. (2018), “The latest technology in construction safety”, BuildSoft, available at: www. buildsoft.com.au/blog/the-latest-technology-in-construction-safety Chantawit, D., Hadikusumo, B. H., Charoenngam, C., & Rowlinson, S. (2005). 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. Chi, H., Kang, S. and Wang, X. (2013). Research trends and opportunities of augmented reality applications in architecture, engineering, and construction. Automation in Construction, 33, pp.116–122. Dimitrov, A. & Golparvar-Fard, M., 2014. Vision-based material recognition for automated monitoring of construction progress and generating building information modeling from unordered site image collections.. Advanced Engineering Informatics, Volume 28, pp. 37- Divakar, K. and Britto, J. (2018), “Factors affecting effective implementation of cost management”, International Research Journal of Engineering and Technology, Vol. 5 No. 5, pp. 3599-3603. Fard, M. G. & Peña-Mora, F., 2007. Application of visualization techniques for construction progress for AR in Education. Journal of Educational Technology Development and Exchange, pp. 119-140. Glick, S., Porter, D. and Smith, C. (2012), “Students visualization: using 3-D models in undergraduate construction management education”, International Journal of Construction Education and Research, Vol. 8 No. 1, pp. 26-46. Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2009). D4AR–a 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication. Journal of Information Technology in Construction, 14(13), pp. 129- Gong, J., Caldas, C. H. & Gordon, C., (2011). Learning and classifying actions of construction workers and equipment using Bag-of-Video-Feature-Words and Bayesian network models.. Advanced EngineeringInformatics, 25(4), pp. 771-782. Hansen, D.R. and Mowen, M.M. (2006), Cost Management: Accounting and Control, Thomson, Mason, OH. Heinzel, A., Azhar, S. & Nadeem, A., 2017. Uses of Augmented Reality Technology during Construction Phase. Revolutionizing the Architecture, Engineering and Construction Industry through Leadership, Collaboration and Technology. Hou, L., Wang, X., Bernold, L. and Love, P.E.D. (2013), “Using animated augmented reality to cognitively guide assembly”, Journal of Computing in Civil Engineering, Vol. 27 No. 5, pp. 439-451. Hui, P., Wei, J., & Peylo, C. (2017). System and method for mobile augmented reality task scheduling: Google Patents. Igwe, U.S., Mohamed, S.F., Mat Dzahir, M.A., Yusof, Z.M. and Khiyon, N.Z. (2020), “Towards a framework of automated resource model for post contract cost control of construction projects”, Journal of Construction Management, Vol. 22, pp. 1-10. Izkara, J. L., Pérez, J., Basogain, X., & Borro, D. (2007). Mobile augmented reality, an advanced tool for the construction sector. In: Paper presented at the Proceedings of the 24th W78 Conference, Maribor, Slovenia. Kalkofen, D., Sandor, C., White, S. and Schmalstieg, D. (2011), “Visualization techniques for augmented reality”, Handbook of Augmented Reality, Springer, New York, NY. Kim, C., Park, T., Lim, H., & Kim, H. (2013). On-site construction management using mobile computing technology. Automation in Construction, 35, pp. 415-423. Kim, J. and Irizarry, J. (2020), “Evaluating the use of augmented reality technology to improve construction management student’s spatial skills”, International Journal of Construction Education and Research, Vol. 17, pp. 1-18. Kim, J. and Irizarry, J. (2021), “Evaluating the use of augmented reality technology to improve construction management student’s spatial skills”, International Journal of Construction Education and Research, Vol. 17 No. 2. Kim, W., Kerle, N. and Gerke, M. (2016), “Mobile augmented reality in support of building damage and safety assessment”, Natural Hazards and Earth System Sciences, Vol. 16 No. 1, pp. 287-298. Koch, C., Neges, M., König, M., & Abramovici, M. (2014). Natural markers for augmented reality-based indoor navigation and facility maintenance. Automation in Construction, 48, pp. 18-30. Kopsida, M. and Brilakis, I. (2016), “Markerless BIM registration for mobile augmented reality based inspection”, Proceedings of the International Conference on Smart Infrastructure and Construction, pp. 1-6. Kumaran, G. S., Santhi, K., & Anand, P. (2007). Impact of augmented reality (AR) in civil engineering. Advanced Materials Research, 18-19, pp. 63-68. Kwon, O.-S., Park, C.-S., & Lim, C.-R. (2014). A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality. Automation in Construction, 46, pp. 74-81. Lee, K. (2012). Augmented reality in education and training. TechTrends, 56(2), pp. 13-21. Machado, R.L. and Vilela, C. (2020), “Conceptual framework for integrating BIM and augmented reality in construction management”, Journal of Civil Engineering andManagement, Vol. 26 No. 1, pp. 83-94. Memon, A.H., Rahman, I.A. and Azis, A.A.A. (2011), “Preliminary study on causative factors leading to construction cost overrun”, International Journal of Sustainable Construction Engineering and Technology, Vol. 2 No. 1, pp. 57-71. Mesaros, P., Mandicak, T. and, Selín, J. (2015), “Modern methods for cost management in construction enterprises”, Selected Scientific Papers – Journal of Civil Engineering, Vol. 10 No. 1, pp. 109-119. Milgram, P., Takemura, H., Utsum, A. & Kishino, F., 1995. Augmented Reality: A class of displays on the reality-virtuality continuum. Telemanipulator andTelepresence Technologies, pp. 282-292. Nwadinobi, C.C. (2025). An evaluation of the implementation of augmented reality on construction project delivery. A Master’s thesis of the Federal University of Technology Owerri, Nigeria. Olsson, T., Kärkkäinen, T., Lagerstam, E., & Ventä-Olkkonen, L. (2012). User evaluation of mobile augmented reality scenarios. Journal of Ambient Intelligence and Smart Environments, 4(1), pp. 29-47. Omar, T., & Nehdi, M. L. (2016). Data acquisition technologies for construction progress tracking. Automation in Construction, 70, pp. 143-155. Park, C., Lee, D. and Khan, N. (2020). An analysis on safety risk jud