References
Abdulaziz M. Jakas, Haupt Theodore. C. (2015) Major construction Risk factors considered by general contractors in Qatar. Journal of Engineering Design And Technology Vol. 13, Issue 1. PP 165-194. Accessed online www. emeraldinsight.com/ doi. Org/10. 1108/ JEDT- 03.2014-0012. Adnan E., Sherif M., Ala'a E. (2011): "Factors Affecting Bid/No Bid Decision in The Gaza Strip Contractors' Perspectives" Revista Ingenieria de Construction, ISSN 0718-5073, Vol.26, No. l, 41-60. Ahmad I. and Minkarah, I. (1988): "Questionnaire Survey on Bidding in Construction", Journal of Management in Engineering, ISSN 0742-597X/88/0003-0229,Vol.4, No. 3, 229-243. Ajayi, O. M. And Ogunsanmi, O. E. (2012): "Decision Maker's Perceptions on Contractor Prequalification Criteria" Interdisciplinary Journal Of Contemporary Research In Business, ISSN 2073-7122, Vol. 4, No 6, 174-203. Aqua Group (2007). Principles of procurement In Hackett, M, Robinson, I and Statham G. (Eds). The Aqua Group Guide to procurement, Tendering and contract Administration Balckwell Publishing: Malden USA & Cartton, Victoria Austria. Bageis, A.S and Fortune C. (2009): Factors affecting the bid/no bid decision in Savdi Arabian construction Contractors. Construction Management and Economics 27(1), P 53.71. Bagis, A.S & Christ F (2009), factors affection the bid/no bid decision in the Saudi Arabian Construction Contractors. Construction management and Economics 27(1), 53.71. Accessed online via www.researchgate.net/publication.on 1st May, 2019. Banki M.T., Esmaeeli B., Ravanshadnia M. (2008): "The Assessment of Bidding V Strategy of Iranian Construction Firm" International Journal of Management Science and Engineering Management, ISSN 1750-9653, Vol. 4 ,No. 2, 153-160. Cartridge D. (2009): Quantity Surveyor’s pocket Book. First Edition. Butter worth – Heinemann. Oxford, USA. Chien-Liang L., Wei L., Min-Ren Y. (2003): "Exploring Contractor's Opportunistic Bidding Behavior and its Impacts on Construction Market" International system dynamic. 1- 17. Chris I. Enyinda, Alphonso O. Ogbuehi, Godwin U. (2011): "A Decision Support Model for Contractor Selection in a Government Procurement Supply Chain: Evidence from an Emerging Market", Journal of Management Policy and Practice, ISSN 2333-6048, Vol. 12(7), 9-17. Doloi, H (2009): Analysis of Pre-qualification criteria in contractor selection and their impact on project success. Construction Management and Economics 27, PP 1245- 1263. https // doi.org/ 10.1080/ 01446190 903394541. Drew D. S., Lo H. and Skitmore R. (2001): "The Effect of Client Type and Size of Construction Work on A Contractor Is Bidding Strategy", Building and environment 36 (3) pp 393-406. Drew D.S, and Skitmore R. M., Martin-S. (1992): "Competitiveness in Bidding: A Consultant's Perspective", Construction Management and Economics, ISSN0144- 6193. Vol. 10. No. 3, 227-247. Drew D.S. and Skitmore R.M., Martin S. (1997): "The Effect of Contract Type and Size on Competitiveness in Bidding", Journal of Construction Engineering Management and Economics, ISSN 1756-5154, Vol. 15, No. 5, 469-489. Enterkin, Hugh and Reynold, G (1978). Estimating for Builders and surveyors. William Heinemann Ltd. London, Taren to and Johannesburg. Fu W., Drew D., and Lo H. (2003): "Competitiveness of Experienced and Inexperienced Contractors in Bidding", Journal of Construction Engineering and Management, ISSN: 0733-9364, Vol. 129, No. 4, 388-395. Harrison, S (1981): Estimating and Tendering- some aspects of tendering information service, The chartered Institute of Building. Vol. 41. Holt, G. D (1998). Which contractor selection methodology? International Journal of project management. 16, 153-164 http//doi . org. I 10. 1016/50263 – 7863. Ioannou G., Sou-Sen L. (2000): ''Average Bid Method A Competitive Bidding Strategy" Journal of Construction Engineering and Management, ISSN: 0733-9364, Vol. 199, No. l, 131-147. Lam, K. C, Palanees Waran, E and Yu, C (2009). A support vector machine model for contractor pre-qualification. Automation in construction 18, 321 – 329. https/doi. Org/10. 10161 J. autcon. Laryea, S. (2012): Price formation in construction Contracts In: Caryea, S. Agyepong, S. Leiringer, R and Hughes, W (EDS). West Africa Built Environment Research (WABER) Conference & EPP Book Ltd. Laryea, S. (2012): Procuement and contracts. In: Laryea, S. Agyepong, S. Leiringer R and Hughes W (Eds). West Africa: Built Environment Research (WABER) Conference & EPP Book Ltd. Mac-Barango, D. O. and Ayeba-Enenimiete, A. K (2008). Some Technical and Managerial problems of indigenous construction contractors in Nigeria. The Nigerian Journal of Environment Sciences Vol2:2: 199-219. Mc Caffer, R and Baldwin, A (1986. Estimating And Estimating for Civil Engineering work. Collins Professional and Technical Books. London. Mills A. and Skitmore, Martin R. (1999): "A Comparison of Client and Contractor Attitudes to Prequalification Criteria", Proceedings The International Council for Building Research Studies and Documentation (CIB) "Portable Partnering in Construction and Procurement", 699-708. Mohammeds & Enshassai Karriri A (2010): Factors Affecting the Bid/No Bid Decision in the palestinion construction industry. Journal of financial management of property and Construction. Vol. 15, Issue 2. Emerald publishing. Accessed online from www. emeraldinsight.com/doi//abs/10.1108 on 3 rd May, 2019. Mudorch, J and Hughes (2000): Construction Law and Management: Third edition: E & FN Spoon USA & Canada. London. USA and Canada. Mudorch, J and Hughes W. (2008): Contraction contracts 4 Edition. London. Taylor and Francis. National Joint Consultative Committee for Building. NJCC (1977). Code of procedure for single stage selective Tendering. RIBA Publications Limited London. Ng, S. T and LUU, C.D.T (2008). Modeling subcontractor Registration Decision through Case Based Reasoning Approach. Automation in Construction 17, 873 – 881. https//doi.org/10.1016. Autcon. 2008. Prajapati R, Pitroda J and Bhavasa (2015): Analysis of factors Affecting contractors Bidding strategy using Rll method. International journal of modern tender. In Engineer & Research IJMTER volume 2, issue 4. Prajapati, R. Pitroda J and Bhavsar J.J (2015). A Review of Competitive Bidding procedure and strategy of Bidding. Journal of International Academic Research for Muiti disciplinary Vol. 2, issue 12. ISSN 2320-5083. Accessed online www.jiarm. Com on 13 March, 2019. Ramus, J. W. (1981): Contract practice for Quantity Surveyor. Heinemain London. Rasibeck, P (2008): Perceptions of Architectural Design and project Risk. Understanding the Architect’s role. Construction Management & Economics. 26, 1145- 1157. https//doi.org//10.1080/014461//90802512342 Ravanshadnia M., Rajaie H. and Abbasian H. (2011): "A Comprehensive bid/No-Bid Decision Making Framework For Construction Companies" international Journal of Science & Technology ISSN 2321 919X,Vol. 35, No. Cl, 95-103. Seeley I.H (1996): Building Economics Appraisal and control of building design cost and Efficiency Fourth Edition. Palgrave Macmillan. Shokri-Ghasabah Morteza (2015) Critical factors influencing the bid/no bid decision in the Austration construction industry: Construction innovation Emerald publishing: Accessed Vol. 16: No 2,PP 127-157. Online via. www. emeraldinsight.com doi.org 10.1108/cl-04-2015-0021. Shumank Deep, Deepak Singh, Syed Aqueel Ahmad (2017) A Review of contract Awards to Lowest Bidder in Indian Construction Projects Via Case Based Approach Vol. 5, PP 159-168. Journal of Business And Management Scientific Research Publishing Inc. accessed online via. www. Growkudos. Com/doi 10.4236/ojbm. Smith, A (1990): Estimating, Tendering and Bidding for Construction: Bidding strategies: Macmillan Building and Surveying series. Accessed online