WORLD JOURNAL OF INNOVATION AND MODERN TECHNOLOGY (WJIMT )

E-ISSN 2504-4766
P-ISSN 2682-5910
VOL. 6 NO. 1 2022
DOI: https://doi.org/10.56201/wjimt.v6.no1.2022.pg 57.69


Determinant Variables of Quality Tendering and Effect on Construction Project Time Scale and Successful Delivery

Dumo O. Mac-Barango


Abstract


The tendering procedure as well as the derived or selected tenders have high propensity to influence projects success or failures. Using simple classified as well as questionnaire method of data administration, the research collected data on the factors that affect the derivation of quality tenders and the effects which lack of quality tenders can have on timely and successful projects: Research findings established an array of factors which influence the quality of tenders. Variables such as errors in contract drawings, tough market competition unforeseen changes in materials prices during construction stages were identified and ranked as the first three. In a similar vein, abandonment of project, due to losses and late project delivery, loss of contractors’ profits was identified and ranked as the three most predominant effects amongst others. The research concludes that the derivation of quality tenders have effect on timely project delivery. The research recommends that the tendering processes and procedures should be scrutinized, consciously avoiding “Lowest bid Criteria” as the sole basis for arriving at tenders and subsequently for the award of contracts.


(i) Tenders and Tendering (ii) Lowest Bid Price (iii) Quality Tenders (iv) Variables influencing the quality of tenders (v) The Impact of Quality Tenders on Time Scale & Project Delivery.


References:


AibinuA. A. And Jagboro G. O. (2002): The Effects of Construction Delays on
Project Delivery in Nigeria Construction Industry: International Journal of Project
Management 20; 593-599 Accessed online www.elsevier.com/Locate/ijproman.

Al-herbi et-al (1994): Major problems facing estimators in Saudi Arabia.
www.googlebooks.

Blois de Michael, Herazo – Cueto& Co. (2010): Relationships Between
Construction Clients, and Participants of the building industry. Structures and
mechanisms of co-ordination, communication, Architecture (Architectural
Engineering and Design Management Vol. 6 (1) 1-20: Accessed online via
www.researchgate.net publication (1 st February, 2021.)

Brook, M. (2004): Estimating and Tendering for Construction Work. Third
Edition Accessed onlinewww.academia.edu.


DOWNLOAD PDF

Back