Bidding/Tendering Strategies: As Success Determinants of Construction Tenders

Dumo O. Mac-Barango


Abstract


Bidding/Tendering Strategies provide the means through which contractors win jobs. This research examines tenders submitted by contractors with a view to assessing several of the factors that are critical and predominant in the success equation towards winning jobs. The Research also assesses the factors that influence contractors’ tenders as well as the challenges faced in the course of submitting tenders. Using both primary and secondary data sources, the research obtains data on several of the factors that impact on tenders. The statistical technique of central tendency was used for the analysis of the factors which impact on tenders. Research findings reveals as follows: Financial stability of contractor, availability of resources size of construction firm, work experience of construction firm, professional affiliation of contractors are significant variables that impact on tenders. The listed variables recorded values that were between 4.00 and 2.76. The research concludes that financial stability of the contractors with a mean score of 4.00 is the highest ranked factor whilst number of competitors with a mean score of 2.76 is ranked the least factor affecting contractors tender. The research recommends that contractors’ financial stability is a critical factor for consideration during the evaluation of tenders to be submitted by contractors and subsequently the award.


keywords:

Construction Tenders, Contractors, Clients, Consultants, Bidding/Tendering Strategies.


References:


Abdulaziz M. Jakas, Haupt Theodore. C. (2015) Major construction Risk factors considered
by general contractors in Qatar. Journal of Engineering Design And Technology Vol.
13, Issue 1. PP 165-194. Accessed online www. emeraldinsight.com/ doi. Org/10.
1108/ JEDT- 03.2014-0012.

Adnan E., Sherif M., Ala'a E. (2011): "Factors Affecting Bid/No Bid Decision in
The Gaza Strip Contractors' Perspectives" Revista Ingenieria de Construction, ISSN
0718-5073, Vol.26, No. l, 41-60.

Ahmad I. and Minkarah, I. (1988): "Questionnaire Survey on Bidding in Construction",
Journal of Management in Engineering, ISSN 0742-597X/88/0003-0229,Vol.4, No. 3,
229-243.

Ajayi, O. M. And Ogunsanmi, O. E. (2012): "Decision Maker's Perceptions on Contractor
Prequalification Criteria" Interdisciplinary Journal Of Contemporary Research In
Business, ISSN 2073-7122, Vol. 4, No 6, 174-203.

Aqua Group (2007). Principles of procurement In Hackett, M, Robinson, I and Statham G.
(Eds). The Aqua Group Guide to procurement, Tendering and contract Administration
Balckwell Publishing: Malden USA & Cartton, Victoria Austria.

Bageis, A.S and Fortune C. (2009): Factors affecting the bid/no bid decision in Savdi Arabian
construction Contractors. Construction Management and Economics 27(1), P 53.71.

Bagis, A.S & Christ F (2009), factors affection the bid/no bid decision in the Saudi Arabian
Construction Contractors. Construction management and Economics 27(1), 53.71.
Accessed online via www.researchgate.net/publication.on 1st May, 2019.

Banki M.T., Esmaeeli B., Ravanshadnia M. (2008): "The Assessment of Bidding V Strategy
of Iranian Construction Firm" International Journal of Management Science and Engineering Management, ISSN 1750-9653, Vol. 4 ,No. 2, 153-160.

Cartridge D. (2009): Quantity Surveyor’s pocket Book. First Edition. Butter worth –
Heinemann. Oxford, USA.

Chien-Liang L., Wei L., Min-Ren Y. (2003): "Exploring Contractor's Opportunistic Bidding
Behavior and its Impacts on Construction Market" International system dynamic. 1-
17.

Chris I. Enyinda, Alphonso O. Ogbuehi, Godwin U. (2011): "A Decision Support Model for
Contractor Selection in a Government Procurement Supply Chain: Evidence from an
Emerging Market", Journal of Management Policy and Practice, ISSN 2333-6048,
Vol. 12(7), 9-17.

Doloi, H (2009): Analysis of Pre-qualification criteria in contractor selection and their impact
on project success. Construction Management and Economics 27, PP 1245- 1263.
https // doi.org/ 10.1080/ 01446190 903394541.

Drew D. S., Lo H. and Skitmore R. (2001): "The Effect of Client Type and Size of
Construction Work on A Contractor Is Bidding Strategy", Building and environment
36 (3) pp 393-406.

Drew D.S, and Skitmore R. M., Martin-S. (1992): "Competitiveness in Bidding: A
Consultant's Perspective", Construction Management and Economics, ISSN0144-
6193. Vol. 10. No. 3, 227-247.

Drew D.S. and Skitmore R.M., Martin S. (1997): "The Effect of Contract Type and Size on
Competitiveness in Bidding", Journal of Construction Engineering Management and
Economics, ISSN 1756-5154, Vol. 15, No. 5, 469-489.

Enterkin, Hugh and Reynold, G (1978). Estimating for Builders and surveyors. William
Heinemann Ltd. London, Taren to and Johannesburg.

Fu W., Drew D., and Lo H. (2003): "Competitiveness of Experienced and Inexperienced
Contractors in Bidding", Journal of Construction Engineering and Management,
ISSN: 0733-9364, Vol. 129, No. 4, 388-395.

Harrison, S (1981): Estimating and Tendering- some aspects of tendering information
service, The chartered Institute of Building. Vol. 41.

Holt, G. D (1998). Which contractor selection methodology? International Journal of project
management. 16, 153-164 http//doi . org. I 10. 1016/50263 – 7863.

Ioannou G., Sou-Sen L. (2000): ''Average Bid Method A Competitive Bidding Strategy"
Journal of Construction Engineering and Management, ISSN: 0733-9364, Vol. 199,
No. l, 131-147.

Lam, K. C, Palanees Waran, E and Yu, C (2009). A support vector machine model for
contractor pre-qualification. Automation in construction 18, 321 – 329. https/doi.
Org/10. 10161 J. autcon.

Laryea, S. (2012): Price formation in construction Contracts In: Caryea, S. Agyepong, S.
Leiringer, R and Hughes, W (EDS). West Africa Built Environment Research
(WABER) Conference & EPP Book Ltd.

Laryea, S. (2012): Procuement and contracts. In: Laryea, S. Agyepong, S. Leiringer R and
Hughes W (Eds). West Africa: Built Environment Research (WABER) Conference &
EPP Book Ltd.

Mac-Barango, D. O. and Ayeba-Enenimiete, A. K (2008). Some Technical and Managerial
problems of indigenous construction contractors in Nigeria. The Nigerian Journal of
Environment Sciences Vol2:2: 199-219.

Mc Caffer, R and Baldwin, A (1986. Estimating And Estimating for Civil Engineering work.
Collins Professional and Technical Books. London.

Mills A. and Skitmore, Martin R. (1999): "A Comparison of Client and Contractor Attitudes
to Prequalification Criteria", Proceedings The International Council for Building
Research Studies and Documentation (CIB) "Portable Partnering in Construction and
Procurement", 699-708.

Mohammeds & Enshassai Karriri A (2010): Factors Affecting the Bid/No Bid Decision in
the palestinion construction industry. Journal of financial management of property
and Construction. Vol. 15, Issue 2. Emerald publishing. Accessed online from www.
emeraldinsight.com/doi//abs/10.1108 on 3 rd May, 2019.

Mudorch, J and Hughes (2000): Construction Law and Management: Third edition: E & FN
Spoon USA & Canada. London. USA and Canada.

Mudorch, J and Hughes W. (2008): Contraction contracts 4 Edition. London. Taylor and
Francis.
National Joint Consultative Committee for Building. NJCC (1977). Code of procedure for
single stage selective Tendering. RIBA Publications Limited London.

Ng, S. T and LUU, C.D.T (2008). Modeling subcontractor Registration Decision through
Case Based Reasoning Approach. Automation in Construction 17, 873 – 881.
https//doi.org/10.1016. Autcon. 2008.

Prajapati R, Pitroda J and Bhavasa (2015): Analysis of factors Affecting contractors Bidding
strategy using Rll method. International journal of modern tender. In Engineer &
Research IJMTER volume 2, issue 4.

Prajapati, R. Pitroda J and Bhavsar J.J (2015). A Review of Competitive Bidding procedure
and strategy of Bidding. Journal of International Academic Research for Muiti
disciplinary Vol. 2, issue 12. ISSN 2320-5083. Accessed online www.jiarm. Com on
13 March, 2019.

Ramus, J. W. (1981): Contract practice for Quantity Surveyor. Heinemain London.

Rasibeck, P (2008): Perceptions of Architectural Design and project Risk. Understanding the
Architect’s role. Construction Management & Economics. 26, 1145- 1157.
https//doi.org//10.1080/014461//90802512342

Ravanshadnia M., Rajaie H. and Abbasian H. (2011): "A Comprehensive bid/No-Bid
Decision Making Framework For Construction Companies" international Journal of
Science & Technology ISSN 2321 919X,Vol. 35, No. Cl, 95-103.

Seeley I.H (1996): Building Economics Appraisal and control of building design cost and
Efficiency Fourth Edition. Palgrave Macmillan.

Shokri-Ghasabah Morteza (2015) Critical factors influencing the bid/no bid decision in the
Austration construction industry: Construction innovation Emerald publishing:
Accessed Vol. 16: No 2,PP 127-157. Online via. www. emeraldinsight.com doi.org
10.1108/cl-04-2015-0021.

Shumank Deep, Deepak Singh, Syed Aqueel Ahmad (2017) A Review of contract Awards to
Lowest Bidder in Indian Construction Projects Via Case Based Approach Vol. 5, PP
159-168. Journal of Business And Management Scientific Research Publishing Inc.
accessed online via. www. Growkudos. Com/doi 10.4236/ojbm.

Smith, A (1990): Estimating, Tendering and Bidding for Construction: Bidding strategies: Macmillan Building and Surveying series. Accessed online