International Journal of Engineering and Modern Technology (IJEMT )
E-ISSN 2504-8848
P-ISSN 2695-2149
VOL. 8 NO. 2 2022
DOI: https://www.doi.org/10.56201/ijemt.v8.no2.2022.pg24.35
Orima Ogubuike Kingsley, Isaac O. E. and Nkoi B
Consideration of difficulties inherent in maintenance management system in Nigerian oil and gas industries, and to eliminate the tedium associated in the system and improve equipment performance. In this work an attempt was made to assess the equipment maintenance practice in Kwale gas recycling plant of Nigeria Agip Oil Company Limited. Overall equipment effectiveness (OEE) indicator was used to determine the performance of various types of pumps and Turbine power generators installed in the plant, Maintenance records of the pumps and gas Turbine generators provided data for the computation and analysis. The availability, performance and quality rate of the pumps and gas Turbine generators were used to assess the overall effectiveness of the equipment used in the system. Detailed analysis of the failure rate and downtime revealed that a Plan Do Check Act (PDCA) system which is a proactive (predictive) maintenance technique was not adopted in the plant. The highest OEE value of 8.9% obtained confirmed that the current maintenance strategy and policy of the company is very much below standard and unacceptable. Hence this work affirms that the use of PDCA will avert unexpected system failure through early detection of faults, improve safety operation, reliabilit y and durability of equipment. Thereby far less (i) human effort is wasted and (ii) energy expended, both of which led to increase in availability and profitability.
Availability, Performance, Quality Rate and OEE
Ahmad, N., Hossen, J. & Ali, S. M. (2018). Improvement of Overall Equipment Efficiency of
Ring Frame through Total Productive Maintenance: A Textile Case. The International
Journal of Advanced Manufacturing Technology, 94(14), 239-256.
Ali, A. Z. & Ali-nejat, B. E. (2014). Assessing the Effect of Implementation EFQM Model in
Gachsaran Oil and Gas Company. Interdisciplinary Journal of Contemporary Research
in Business, 5(10), 236-251.
Bulent, D., Phil, T., & Richard, G. (2000). Overall Equipment Effectiveness as a Measure of
Operational Improvement a Practical Analysis. International Journal of Operations &
Production Management, 20(12), 1488-1502.
Dal, B., Tugwell, P & Greatbanks, R. (2000). Overall Equipment Effectiveness as a Measure for
Operational Improvement: A Practical analysis. International. Journal. Oper. Prod.
Manag. 20(12).
Huang, S. H., Dismukes, J. P., Shi, J., Su, Q., Razzak, M. A., Bodhale, R. & Robinson, D. E.
(2003). Manufacturing Productivity Improvement using Effectiveness Metrics and
Simulation Analysis. International Journal of Production Research, 41(3), 513–527.
Markus, P. R. & Eberhard A. (2015). Enhancement of the overall equipment effectiveness
measure: a contribution for handling uncertainty in shop floor optimization and production planning’, International Journal of Industrial and Systems Engineering,
20(2).
Muthiah, K. M. N. & Huang, S. H. (2006). A Review of Literature on Manufacturing Systems
Productivity Measurement and Improvement. International Journal of Industrial and
Systems Engineering, 1(4), 461–484.
NAOC (2020). Nigerian Agip Oil Company Statistical Bulletin (Kwale-Gas-Recycling-Plant
http://www.naoc.com, 2020).
Philip, G. (2002). Overall Equipment Effectiveness. Manufacturing Engineering, 81(3), 109-112
Raffaele, I. & Maria, E. N. (2013). Managing OEE to Optimize Factory Performance.
Operations Management, Massimiliano, M.S (Ed.), ISBN: 978-953-51-1013-2, InTech,
Available from:http://www.intechopen.com/books/operations- management/managing-
oee-to-optimize- factory-performance.
Ron A. J. De & Rooda, J. E. (2006). OEE and Equipment Effectiveness: an Avaluation.
International journal of Production Research, 44(23), 4987 – 5003.