Akinola Victoria O
Construction projects are capital intensive and risk laden; and contractors only make use of intuition or guess work in allocating contingencies for the presumed project risks. Hence this paper identifies the risk associated with construction projects with a view to assess the means of analysing and managing the inherent risks adopted by indigenous contractors in Nigeria. The paper adopted questionnaire survey on the targeted population of indigenous contractors operating in Lagos State under the umbrella of FOCI using simple random sampling technique. The questionnaire was structured to obtain information on category of risks associated with construction project, the techniques adopted for risk analysis and the measure of controlling or managing the inherent risks. The data collected were analysed using weighted mean, mean interval score (MIS), and multiple regression analysis. The hypothesis was analysed using regression model. The analysed data shows that financial and economic risk, delay risk and contractual and legal risk were prominent among the major risks associated with construction project. The techniques adopted by indigenous contractors in analysing project risks are Delphi Method, Influencing diagram and Portfolio theory while the mechanism of risk managing measures are Prediction, Specialization and Control measures. The regression model indicated a significant and positive relationship between risk managing measures and risk analytical techniques with coefficient ranging from 0.425 to 0.775. The paper concluded that indigenous contractors should adopt Monte-Carlo simulation and Latin-Hyper-Cube sampling that is mathematical oriented to analyse project risks rather than delegating the assessment to third party who are not conversant with the various variables of risk factors on construction projects and recommend that the combination of three measures of managing risks should be adopted in order to pre-empt the unpredictable natur
Construction project; Analytical techniques; Risk management; Managing measures
Baloi, D & Price, A. D. F. (2003); Modeling Global Risk Factors Affecting Construction Cost
Performance, International Journal of Project Management, 21, 261-269.
Brush, D (2005); Qualitative Assessment of Risk on Large Projects, Journal of Construction
Engineering and Management, 281-286.
Chapman, C. (1997); Project Risk Analysis and Management – The PRAM Generic Process,
International Journal of Project Management, 15, 273-281.
Chia, S. E. (2006); Risk Assessment Framework for Project Management, IEEE, 376-379.
Dikmen, I.; Birgonul, M. & Han, S. (2007); Using Fuzzy Risk Assessment to Rate Cost Overrun
Risk in International Construction Projects, International Journal of Project
Management, 25, 494-505.
Institute of Risk Management, (2002); A Risk Management, Standard Institute of Risk
Management.
Institute of Civil Engineers, (2002); Risk Analysis and Management for Projects (RAMP),
Institute of Civil Engineers & Faculty and Institute of Actuaries, Thomas Telford,
London.
John, A. and Peter, D. (1997), „Risk Analysis and Management for Major Construction Projects?,
Proceeding of The RICS Foundation of Construction and Building Research, COBRA, 1-
35.
Kline, P. (1994); An Easy Guide to Factor Analysis, Routledge, London.
Koh, T. Y & Low, S. P. (2008); Organizational Culture and TQM Implementation in
Construction Firms in Singapore, Journal of Construction Management and Economics,
26, 237 – 248.
Nasir, D; McCabe, B and Hartono, L (2003); Evaluating Risk in Construction-Schedule Model
(ERIC-S) Construction Schedule Risk Model, Journal of Construction Engineering and
Management, 129 (5), 518-527
Nieto-Morote, A. & Ruz-Vila, F. (2011); A Fuzzy Approach to Cosntruction Project risk
Assessment, International Journal of Project Management, 29, 220-231.
Odeyinka, H. A. & Lowe, J. G. (2002); A Factor Approach to the Analysis of Risks Influencing
Construction Costflow Forecast, Proceedings of RICS Construction & Building Research
(CORBA) Conference, Edited by Morledge, R., Nottingham Trent University,
Nottingham, UK, September, 5 – 6, 120 – 131.
Project Management Institute, (2008); A Guide to the Project Management Body of Knowledge,
Project Management Institute Standards Committee
Raftery, J; Csete, J and Hui, S. K. F (2001); Are Risk Attitude Robust?: Qualitative Evidence
Before and After a Business Cycle Inflation, Journal of Construction Management and
Economics, 19, 155-164.
Rahman, M. M and Kumaraswamy, M. M (2002); Joint Risk Management Through
Transactionally Efficient Relational Contracting, Journal of Construction Management
and Economics, 20, 45-54.
Tah, J. H. M.; Thorpe, A. &; McCaffer, R. (1993); Contractor Project Risks Contingency
Allocation Using Linguistic Approximation, Computing System in Engineering, 4, 281-
293.
Wang, Y. M. & Elhag, T. M. S. (2007); A Fuzzy Group Decision Making Approach for Brigde
Risk Assessment, Computer & Industrial Engineering, 53, 137-148.
Warszawski, A and Sachs, R (2004); Practical Multifactor Approach to Evaluating Risk of
Investment in Engineering Projects, Journal of Construction Engineering and
Management, 357.
Zhou, L.; Vasconcelos, A & Numes, M. (2008); Supporting Decision Making in Risk
Management Through an Evidence-based Information Systems Project Risk Checklist,
Information Management & Computer Security, 16, 166-186.